top of page

16th Street Paver Replacement
Blake to Wynkoop
Project Summary
Novus Construction is performing targeted sidewalk improvements along 16th Street between Blake and Wynkoop to enhance safety and walkability in this high-traffic downtown corridor. Over time, the existing pavers have settled and become uneven, creating trip hazards and operational challenges for adjacent businesses.
The project involves removing deteriorated pavers, regrading underlying surfaces, and installing new, durable paver systems designed to restore a smooth and consistent pedestrian pathway. Work is being completed with careful coordination to minimize disruption in this active public area.
bottom of page

